HQY255-125 Busduct Busway Bridge Housing Extrusion Pressing Clamping Machine

The LT HQY255-125 presses and clamps busway and cable-tray housings before riveting, holding the enclosure square while joints are fixed.

What the HQY255-125 clamping machine does

The LT HQY255-125 presses and clamps busway and cable-tray housings before riveting, holding the enclosure square while joints are fixed. It covers busbar trunking widths from 91 mm to 255 mm at a 125 mm overall height, which spans the common busway ratings used in South African commercial risers. A pneumatically preloaded clamping block and an 8 mm steel upper plate keep pressure even across the housing.

Measured performance — HQY255-125

Test conditions: Busway or bridge housings from 91 mm to 255 mm wide at 125 mm height, pressed and clamped before riveting.

Measured values: Clamping range 91–255 mm width at 125 mm height; upper pressure plate built from 8 mm steel plate guided by guide blocks; pneumatic pre-clamping block fitted as standard.

Benchmark: Clamping across two nominal busway sizes (125 × 91 mm and 125 × 255 mm) rather than dedicated fixtures per housing size.

HQY255-125 Busduct Busway Bridge Housing Extrusion Pressing Clamping Machine


Features:
1. Use and requirements:The busbar press is equipped with three parts: riveting table, prefabricated table and discharge table. It is used for riveting assembly of busbar row of 91 ~ 255mm width and height of 125mm. After the busbar row is installed, push the riveting table and press Will be targeted after the compression to facilitate the artificial riveting.
2. With relay control, pneumatic clamping, no power roller with integral installation, roller surface covered with polyurethane, to prevent scratching the bridge. The frame steel beam is formed by bending the steel plate and is supported by the steel pipe of the square pipe, which can be adjusted according to the need, the rack surface spray (gray). The upper pressing device is made of bolts with 8mm steel plate as a whole and guided by guide block. Work will be pre-installed bridge to the appropriate position, depress the foot switch, the top material device to lift the bridge from the roller in place after the remain intact, both sides of the clamping device action clamping the bridge, the last pressure Tight device action will be copper compacted. After the completion of artificial riveting, step down the foot switch, the pressure on the rise, both sides of the pressure release, the top material device down the bridge to fall back to the roller surface, the bridge pushed out to the discharge station for follow-up operation.
Bridge processing requirements:
1, the bus press for 125 × 255mm and 125X91mm between the specifications of the bridge, before the riveting clamping operation.
2, Pre-installed part of the pneumatic block on the device.
Technical support:
Busbar press machine instructions:
Including safety warning, machine principle, performance parameters, pneumatic schematic diagram, accessory table, wiring table, safe operating procedures.